Reviewing an intention

How to review a changed plan

A block in your calendar can look the same after an evening that went differently. Perhaps you started late, did part of what you intended, then moved on. The reservation alone cannot describe that.

Choose one plan to look at on paper or in your own notes. Keep its original wording beside an account of what happened. The useful comparison includes what you attempted, what remains uncertain and whether there is anything specific you want to try differently.

Keep the original intention as a reference

Copy the plan as it stood before the event: its date, any reserved start and finish, and what you hoped to do. If the plan was only “read after dinner,” keep that wording. Do not supply a precise duration afterwards.

Leave this in a section labelled “Planned.” It gives you something to compare with the actual record. Changing the old reservation to match what happened would remove that distinction.

Describe the attempt and its outcome separately

In a second section, write what you remember doing. Add approximate times where you can support them and leave gaps unknown. If another activity occupied part of the reserved window, record that activity once. The reservation contributes no extra completed time.

Then describe the outcome in ordinary words: selected some photos, drafted one caption, left the rest untouched. Time spent on something and completion of it are different facts. A task can remain unfinished after a real attempt.

If you cannot remember whether you began, keep that unknown. If you know you did not begin, say so. Neither an empty outcome field nor a still-visible calendar block settles the question by itself.

A fictional comparison: the family album

This example is invented. On 28 October 2026, Omar reviews a plan for the previous evening, 27 October: “19:00–19:45, choose six photos and write their captions.” The reservation was 45 minutes. These rounded times describe the same local clock.

10 + 20 + 15 = 45 minutes of the reserved window. Only about 20 minutes are recorded as album work. The 45-minute reservation is not added to them.
Time on 27 OctoberActual recordApproximate duration
19:00–19:10Washing up after dinner10 min
19:10–19:30Working on the album20 min
19:30–19:45Unknown; not reconstructed15 min

Outcome: three photos selected and one caption drafted. The six-photo plan was partly attempted and remains incomplete. Omar cannot recall what happened in the final 15 minutes or why the album work ended then.

Ask what the comparison actually supports

Omar can say that washing up occupied the beginning of the intended window, album work began about ten minutes later than planned, and the intended result was not finished. The record also preserves a partial result.

It does not explain the unknown final stretch. Filling that gap with “more album work” would borrow an activity from the plan. Calling it “time wasted” would supply a judgment without knowing what happened.

Three selected photos out of six does not establish that half the total work is finished: the captions are a separate part, and the remaining work may differ. There is no need to turn the result into a completion percentage.

Keep an observation such as “washing up overlapped the start” separate from a guess such as “evenings never work for this.” One evening does not show what happens on other evenings.

Consider one adjustment, if the record suggests one

Omar could try placing album time after washing up rather than assuming 19:00 will be clear. That responds to the observed clash at the start. It does not explain the later unknown period or promise that the next attempt will finish the album.

For your own comparison, name the observation and the single change it suggests. You might check what needs to happen first before choosing a start, or clarify what you intend to attempt. Treat the change as something to try, with its result still unknown.

Leave this part blank if you do not have enough information or do not want another attempt. Reviewing the plan does not require booking the unfinished work into tomorrow. Any new reservation stays a plan until you next describe what happened.

Keep a page for yourself

Copy a changed-plan review worksheet

Compare one intention. You can complete the review without making another plan.

REVIEW ONE CHANGED PLAN
Date I am reviewing:
Date the intention concerned:

PLANNED
Original intention, in its original terms:
Reserved start and finish, if any:
Intended result:

ACTUAL
What I remember doing:
Supported or approximate start and finish:
Other activities in that window, counted once:
Gaps or uncertain boundaries:
Outcome I can describe:
Attempted / partly attempted / not begun / unknown:

COMPARISON
What the record supports:
What it does not establish:
An explanation I am only guessing:

OPTIONAL ADJUSTMENT
One observation:
One change I might try because of it:
What remains uncertain:
No new reservation counted as completed activity:

Use this in a place you choose. There are no answers to enter on this website.

From “How to review a changed plan” · hoursgiven.com/guides/review-a-changed-plan

Take this with you

Leave the original intention beside the actual attempt and outcome. Label guesses clearly, and make a new plan only if you choose.